🗓️, 2026
⚡ SPARKY BREAKDOWN — NEC 225 SERIES (PART 2)
WIRING METHODS (225.10–225.12)
joshthesparky4 · Josh The Sparky
OPENING HOOK
Most electricians skip this part… ⚠️
That’s where mistakes start.
CORE IDEA
Not every wiring method is allowed outside.
Article 225 limits you to approved methods built for exposure and durability.
CODE CONNECTION
225.10 — Approved Wiring Methods
• EMT, RMC, IMC, PVC
• MC, MI, SE, UF
• Cable tray, busway
225.11–225.12 — Entering Buildings + Open Conductors
• Entering structures → must follow service rules (230.52, 230.54)
• Open conductors must be supported by:
Knobs
Racks
Insulators (glass or porcelain)
FINAL TAKEAWAY
Outside wiring isn’t about convenience…
It’s about surviving the environment and staying secure. ⚡
👉 TikTok: [INSERT LINK]
👉 Instagram: [INSERT LINK]
👉 YouTube Short: [INSERT LINK]
#NEC #Article225 #ElectricianLife #CodeStudy #ElectricalSafety