Episode 27 — 120.82(B) General Loads
You've passed the eligibility test for the 120.82 dwelling-unit optional method.
Now it's time to start filling the buckets.
The first one is:
And there's a demand-factor shortcut built right into the method.
First:
This gives you your:
Then apply the optional-method demand calculation:
So you're essentially doing:
First 8 kVA
40% of the amount above 8 kVA
=
The optional method doesn't simply make you calculate every general load at 100%.
Instead, once the general-load subtotal exceeds 8 kVA, the excess receives the 40% factor.
8 kVA = full
Everything after = 40%
There are several pieces that get added together before applying the 8 kVA / 40% calculation.
Use:
for the dwelling-unit floor area determined using the applicable floor-area provisions.
This accounts for:
💡 General lighting
🔌 General-use receptacle loads
Add:
for each required:
🔌 20A small-appliance branch circuit
and
🧺 laundry branch circuit
These are added to the general-load subtotal before applying the optional-method demand factor.
Add the applicable nameplate ratings for:
Fastened-in-place appliances
Appliances supplied by individual branch circuits
Ranges
Ovens
Counter-mounted cooking units
Dryers that aren't part of the laundry-circuit calculation
Water heaters
The applicable equipment gets added into the general-load subtotal.
Also include the applicable:
of permanently connected motors that haven't already been included elsewhere in the general-load calculation.
Let's say you've added everything that belongs in the general-load subtotal.
Your result is:
Now apply the optional-method rule.
8 kVA × 100% = 8 kVA
2 kVA × 40% = 0.8 kVA
8 kVA + 0.8 kVA =
That's your calculated general load.
The 40% factor does NOT apply to the entire subtotal.
For a 10 kVA subtotal, don't do:
10 × 40% = 4 kVA ❌
Instead:
8 kVA at 100%
2 kVA at 40%
=
A dwelling's general-load subtotal before applying the optional-method demand factor is:
Per 120.82(B), what's the calculated general load?
A) 10 kVA flat
B) 8 kVA + 40% of 2 kVA = 8.8 kVA
C) 40% of 10 kVA = 4 kVA
D) 8 kVA flat; ignore the rest
👇 Show your math!
Here's the calculation:
First 8 kVA:
8 × 100% = 8 kVA
Remaining 2 kVA:
2 × 40% = 0.8 kVA
Step 1
Add the applicable general loads.
↓
Step 2
Get your subtotal.
↓
Step 3
Apply:
↓
You've now filled the first bucket of the optional dwelling-unit calculation.
But there's still more to calculate.
General Loads ✅
Heating & Air-Conditioning ⏭️
EVSE ⏭️
And eventually, we'll put the buckets together.
Continue exploring the JoshTheSparky Quick Hits library.
Test what you know with the JoshTheSparky Brain Busters.
Take the latest JoshTheSparky Question of the Week.
Go deeper into electrical thoughts, lessons, discoveries, and experiences in Sparky's Journal.
Follow the latest progress, discoveries, projects, and industry updates in Sparky Weekly.
Review the references and resources used throughout JoshTheSparky.com in the JoshTheSparky Sources library.
← Back to Article 120 Quick Hits
← Episode 26 — Who Gets to Use This Shortcut?
→ Episode 28 — Bucket #2: Heating & Air-Conditioning
Episode 25: Welcome to Part IV
Episode 26: Who Gets to Use This Shortcut?
Episode 27: Bucket #1 — General Loads ← YOU ARE HERE
Episode 28: Bucket #2 — Heating & Air-Conditioning
Episode 29: Bucket #3 — EVSE
Episode 30: Putting the Optional Method Together
This Quick Hit is an educational explanation based on the author's understanding of the NEC. It is not a substitute for the official NEC, applicable local amendments, manufacturer instructions, or the determination of the Authority Having Jurisdiction (AHJ).
Always verify the requirements applicable to your specific installation.