Article: 120 — Load Calculations
Part: Part IX — Mobile and Manufactured Homes
Section: 120.141
Format: Quick Hit
We've spent the last several episodes working through the load calculations for individual mobile and manufactured homes.
Now we take the final step:
What happens when multiple mobile homes are supplied by one park wiring system?
Section 120.141 provides the demand-factor method for calculating the load of a mobile home park.
And this is it — the TRUE SERIES FINALE of Article 120.
When calculating the load for the park wiring system, the calculation is based on the larger of two values.
The first option is:
➡️ 16,000 VA per mobile home lot
This establishes a baseline load for each mobile home lot.
The second option is the actual load calculated under 120.140 for the largest typical mobile home that the lot will accept.
So the park calculation uses whichever is larger:
16,000 VA
OR
The actual 120.140 load for the largest typical mobile home
➡️ Always use the larger value.
This gives the park wiring system a calculation based on the homes the park is realistically designed to accommodate.
Once the per-home load basis has been established, Table 120.141 provides demand factors based on the number of mobile homes.
The basic concept is diversity:
The more mobile homes connected to the park wiring system, the less likely it is that every home will simultaneously operate at its maximum calculated load.
➡️ 100%
With only one home, there is no demand-factor reduction.
➡️ 55%
The demand factor drops significantly once a second home is included.
➡️ 33%
At five homes, the applicable demand factor is 33%.
➡️ 27%
The demand factor continues to decrease as the number of homes increases.
➡️ 24%
The curve begins to flatten as the park gets larger.
➡️ 23%
The demand factor decreases slightly further.
➡️ Demand factor not available in the source material used for this Quick Hit
⚠️ The supplied source text does not include the percentage for the "61 and over" row.
Rather than filling in a missing NEC value from memory, the percentage is intentionally left unidentified until the complete table can be verified.
Table 120.141 follows the same basic diversity concept we've seen throughout Article 120.
A single mobile home requires the entire calculated load to be considered.
As more homes are added, the probability that every home will simultaneously operate at its maximum calculated demand decreases.
That's why the demand factor drops.
Think of the progression:
1 home → 100%
⬇️
2 homes → 55%
⬇️
5 homes → 33%
⬇️
10–12 homes → 27%
⬇️
22–40 homes → 24%
⬇️
41–60 homes → 23%
⬇️
61+ homes → [source value unavailable]
The interesting part is how quickly the percentage drops early on, then begins to flatten as the park gets larger.
There is an important limitation associated with this demand-factor method.
No demand factor is allowed for any other load in the park beyond what is specifically provided for in the Code.
In other words:
This table is not a general-purpose demand factor for every load at a mobile home park.
The demand factors in Table 120.141 apply to the mobile-home load covered by this section.
Other park loads must be calculated using their applicable NEC requirements.
When you see 120.141, remember:
🏘️ Mobile home park
⚡ Park wiring system
📐 120/240V
➡️ Start with the larger of:
16,000 VA per mobile home lot
OR
The actual 120.140 load for the largest typical mobile home the lot will accept
Then:
📊 Apply the appropriate Table 120.141 demand factor based on the number of mobile homes.
And remember:
⚠️ Don't apply the mobile-home demand factor to other park loads unless the Code specifically permits it.
Per Table 120.141, what demand factor applies to a mobile home park with exactly 3 mobile homes?
A) 55%
B) 44%
C) 39%
D) 33%
Table 120.141 provides demand factors based on the number of mobile homes.
You need to identify the row that applies to 3 mobile homes, rather than simply choosing the nearest listed data point.
The exact 3-home demand factor should be verified against the complete Table 120.141 source before publishing.
⚠️ The supplied table data in the source material provided for this series includes:
1 home → 100%
2 homes → 55%
5 homes → 33%
10–12 homes → 27%
22–40 homes → 24%
41–60 homes → 23%
61 and over → percentage unavailable
The intermediate 3-home value is not included in the supplied source data, so it should not be guessed or substituted.
Continue the Article 120 Quick Hits:
🌐 www.JoshTheSparky.com/quick-hits
Test yourself with Brain Busters:
🧠 www.JoshTheSparky.com/brain-busters
Answer the Question of the Week:
❓ www.JoshTheSparky.com/question-of-the-week
Read Sparky's Journal:
📓 www.JoshTheSparky.com/sparkys-journal
Catch the latest Sparky Weekly:
📰 www.JoshTheSparky.com/sparky-weekly
View Sources & References:
📚 www.JoshTheSparky.com/Sources
Primary: Article 120, 120.141
Related: 120.140 — Mobile and Manufactured Homes
Related: Table 120.141 — Allowable Demand Factors
The supplied source material does not include the demand-factor percentage for the "61 and over" row of Table 120.141.
The supplied material also does not provide the intermediate value needed to verify the 3-home review question.
No percentage has been guessed or substituted.
Once the complete table is available, the missing values can be patched with the verified NEC information.
Article 120 — "Load Calcs Won't Kill You"
🏁 SERIES FINALE
Episode 43: Marinas: Shore Power Gets Its Own Discount Curve
Episode 44: RV Parks: Every Site Gets a Starting Number
Episode 45: RV Parks: The Bigger the Park, the Bigger the Discount
Episode 46: Mobile Homes: A Whole Different Calculation System
Episode 47: Mobile Homes: Everything Else Gets Added On
Episode 48: The Freestanding Range Table + One Last Shortcut
Episode 49: 120.141 Allowable Demand Factors — SERIES FINALE
We've now reached the end of the Article 120 Quick Hit series.
Across 49 episodes, we've worked through:
✅ Part I — General Rules
Voltages, rounding, floor area, noncoincident loads, and power control systems.
✅ Part II — Branch-Circuit Loads
Dwelling and non-dwelling branch-circuit load calculations and outlet requirements.
✅ Part III — Feeder & Service Loads
Lighting loads, demand factors, dryers, ranges, EVSE, neutral calculations, and other feeder/service load calculations.
✅ Part IV — Optional Methods
Optional dwelling methods and specialized calculation approaches.
✅ Part V — Farms
Farm buildings and agricultural load calculations.
✅ Part VI — Health Care Facilities
Hospital receptacle loads and patient-care equipment circuits.
✅ Part VII — Marinas, Boatyards, Floating Buildings & Docking Facilities
Shore-power receptacles and their demand factors.
✅ Part VIII — RV Parks
RV site loads and park-wide demand factors.
✅ Part IX — Mobile & Manufactured Homes
Individual mobile-home calculations, freestanding ranges, and finally mobile-home park demand factors.
49 Episodes.
9 Parts.
One entire NEC article broken down into Quick Hits.
From the first calculation rules all the way through 120.141, we've followed Article 120 from beginning to end.
And now:
NEC Article 120 — "Load Calcs Won't Kill You"
⚡ 49 Episodes.
📚 9 Parts.
🔌 1 Article.
A standalone recap graphic can close out the series:
Use it as a final trophy-case post and a pinned introduction for anyone discovering the series after the fact.
Article 120 — "Load Calcs Won't Kill You"
🏁 SERIES COMPLETE